TRA Studio

Resources

Knowledge hub

Guides, example projects and reference material to get your TRA done.

Example projects

Complete, worked TRAs you can open and learn from.

Smart thermostat (CRA default class)

A full worked TRA for a consumer IoT device — 12 components across four zones, 11 rated threats and their treatments, and the system diagram. Open it as your own draft from the Library on the Projects page.

Industrial gateway (IEC 62443, CRA class I)

A component-level TRA for an OT edge gateway against an IEC 62443-4-2 SL-2 target — 17 components across five zones, 13 rated threats with 16 treatments, a documented compensating countermeasure, and the system diagram. Open it as your own draft from the Library on the Projects page.

SaaS backend, self-hosted edition (CRA default class)

Backend software sold both as SaaS and for self-hosting, and why only the self-hosted edition is in CRA scope — 14 components across five zones including the build pipeline, 15 rated threats with 17 treatments, CRA Annex I categories instead of IEC 62443, and the system diagram. Open it as your own draft from the Library on the Projects page.

Example process descriptions

Complete, realistic documents from a fictitious 45-person manufacturer. Each has its own page, so you can link to it from inside TRA Studio.

See all example documents →

Example project plans

The example document set shows what a CRA-aligned process writes down. These plans show the order it gets written in, who does it, and roughly how long it takes. Two of them follow the simplified default-product workflow — one to put the company-level processes in force, one to take a single product through them. The third runs the full workflow template, with every conformity-assessment route open.

Plan A

Establish the CRA processes

Vulnerability handling and CVD, SBOM tooling and component overview, Article 14 reporting readiness — the foundations every product then inherits, ending in a tabletop exercise against the clock.

Duration
6 weeks, part-time
Effort
~19 person-days across 3 roles
Timing anchor
Art. 14 applies from 11 Sep 2026
Read the plan →

Plan B

An example product through the CRA lifecycle

Plan, build & verify, release, maintain — the SensorNode S300 from classification to CE marking and on into steady-state maintenance, with the gate evidence named at each step.

Duration
16 weeks to market placement
Route
Module A self-assessment
Timing anchor
Full CRA application from 11 Dec 2027
Read the plan →

Plan C

Paid plans

The full CRA workflow, end to end

The complete template rather than the self-assessment subset: 23 corporate process documents, the supply-chain controls, every conformity-assessment route including the notified-body ones, and the quality-system branch.

Duration
~30 weeks on Module A, plus notified-body lead time
Effort
~110 person-days across 9 roles
Covers
60 activities in 5 phases
Read the plan →
See all project plans →